SIGN-IN

Cluster copper.sharcnet.ca

Links System documentation in the SHARCNET Help Wiki

Manufacturer Dell
Operating System CentOS 6
Interconnect FDR Infiniband
Total processors/cores 716
Nodes
1‑8
16 cores
2 sockets x 8 cores per socket
Intel Xeon E5-2630 v3 @ 2.4 GHz
Type: Compute
Notes: Each node has four NVIDIA Tesla K80 GPU cards. Each card has two Kepler GK210 GPUs. Run time limited to four (4) hours for non-contribution users.
Memory: 96.0 GB
Local storage: 2 TB
9‑28
24 cores
2 sockets x 12 cores per socket
Intel Xeon E5-2690 v3 @ 2.6 GHz
Type: Compute
Notes: Run time limited to four (4) hours for non-contribution users.
Memory: 64.0 GB
Local storage: 500 GB
29‑32
24 cores
2 sockets x 12 cores per socket
Intel Xeon E5-2690 v3 @ 2.6 GHz
Type: Compute
Memory: 128.0 GB
Local storage: 500 GB
33
12 cores
2 sockets x 6 cores per socket
Intel Xeon E5-2620 v3 @ 2.4 GHz
Type: Compute
Memory: 768.0 GB
Local storage: 800 GB
Total attached storage 27.7 TB
Suitable use

Parallel applications with GPU acceleration.

Large memory applications.

Software available

MKL, NETCDF, TEXLIVE, GCC, FFTW, OPENCV, R, LAMMPS, HDF, PYTHON, NCL, BOOST, GNUPLOT, GDB, BINUTILS, CMAKE, SAMTOOLS, MPFUN90, OPENJDK, NAMD, INTEL, BIOSAMTOOLS, ANSYS, EMACS, GEANT4, BIOPERL, OPEN64, MONO, MPFUN2015, OPENMPI, PNETCDF, CUDA, ACML, LLVM, IPM, PERL, BIOPERLRUN, CPAN, GSL, LDWRAPPER, PETSC_SLEPC, OCTAVE, ARPACK-NG, QD, RUBY, NIX, SIESTA, PROOT, MPC, GHC, VMD, SYSTEM, BLAST, AUTODOCKVINA, SUBVERSION, GIT, NCBIC++TOOLKIT, NINJA

Current system state details Graphs

Recent System Notices

Status Status Notes
Jul 05 2018, 03:20PM
(6 months ago)

The copper cluster is back up after a power outage. Please report any problems via help@sharcnet.ca

Jul 05 2018, 02:38PM
(6 months ago)

copper is down after brief thunderstorm-induced power outages. We’re waiting until the storm passes before restarting, should just be a few minutes.

Jun 12 2018, 03:44PM
(6 months ago)

The copper cluster is back up after a power outage. Please report any problems via help@sharcnet.ca

Jun 10 2018, 08:47AM
(6 months ago)

A brief power outage at UW has shut down copper. Running jobs were lost. We are working on bringing the system back up.

May 14 2018, 03:40PM
(7 months ago)

Cluster is back up after a power outage.

Sign-in to get full status history